Project Scenario
Large-scale Utility Solar Power Station
Agricultural Solar Power Station
Mountain power station
Gobi Desert Solar Power Station
Distributed Solar Power Station
Jubail 44MW Solar Power Project in KSA
Rabigh 399MW Solar Power Project in KSA
CEME1 480MW Solar Power Project in Chile
Feidong 20MW Solar Power Project in China
Sihong 10MW Project in China
Yi Guang 5MW Solar Power Project in China
Lingbi 30MW Solar Power Project
Jiaokou 84MW Solar Power Project in China
PingDing 7.4MW Solar Power Project in China
Red Sea 400MW Solar Power Project in Saudi
Iraq 2.5MW Solar Power Project
Wuhu 2MW Solar Power Project
Suzhou 0.04MW Solar Power Project
BMW0.06MW Solar Power Project in China

产业布局

Item Distribution
图片名称
图片名称
图片名称

JiaoKou 84MW Solar Power Project in China

图片名称
图片名称

Feidong Jinyang 20MW Solar Power Project in China

图片名称
图片名称

WeiShan 84MW Solar Power Project in China

图片名称
图片名称

Lingbi 30MW Solar Power Project

图片名称
图片名称

Sihong 10MW Project in China

图片名称
图片名称

BeiLun 10MW Solar Power Project in China

图片名称
图片名称

Hetian 30MW Solar Power Project in China

图片名称
图片名称

JinNan 34MW Solar Power Project in China

图片名称
图片名称

Kazakhstan 2MW Solar Power Project

图片名称
图片名称

Israel 0.05MW Solar Power Project

图片名称
图片名称

Bahrain 3.8 MW Solar Power Project

图片名称
图片名称

Red Sea 400MW Solar Power Project in KSA

图片名称
图片名称

Iraq 2.5MW Solar Power Project

图片名称
图片名称

Jubail 44MW Solar Power Project in KSA

图片名称
图片名称

Rabigh 399MW Solar Power Project in KSA

图片名称
图片名称

CEME1 480MW Solar Power Project in Chile

图片名称
图片名称

Thailand 0.3MW Solar Power Project

图片名称
图片名称

Elazığ30MW PV power plant project in Turkey

图片名称
图片名称

Shandong Electric Power Construction 60MW solar project in Abu Dhabi Taweelah

Typical Case
图片名称

The world's Highest Level of Anti-corrosion of PV Cleaning Robot Project in Red Sea, KSA


图片名称

Project pain point

  • Characteristics of high temperature, high humidity and high salinity environment in the coastal area of the Middle East
  • The customer has high anti-corrosion grade requirements
  • Match the flat single-axis connecting rod tracking bracket
图片名称

Highlights

  • Weatherability design of the product to meet high and low temperature reliable operation
  • Customized design of cleaning brush, anti-UV aging and effective solution to saline-alkali dust pollution
图片名称

Capability

400MW

图片名称

Time of operation

Under production

图片名称

Power Generation Increase

图片名称

1st "2P Tracking Bracket + Intelligent Cleaning Robot" Project in Rabigh, KSA


图片名称

Project pain point

  • Track the support project, and the gale operation strategy is strictly required
  • Long one-way cleaning distance
  • Communication scheme reliability
图片名称

Highlights

  • Equipped with gale protection strategy and emergency stop design, combined with active wind protection design
  • Low power consumption design and power supply system matching design, meet the cleaning distance requirements
  • Deploy SCADA locally to meet timeliness and remote control
图片名称

Capability

399MW

图片名称

Time of operation

Under production

图片名称

Power Generation Increase

图片名称

Largest PV Power Plant Project in Chile


图片名称

Project pain point

  • The temperature difference in the desert area is large and the wind and sand are strong
  • Requirements for storm protection levels
图片名称

Highlights

  • Weatherability design of the product to meet high and low temperature reliable operation
  • Customized design of cleaning brush
  • The project adopts 4P arrangement and the robot is nearly 9.2 meters long
  • The cleaning distance of a single robot is 2.2KM
图片名称

Capability

480MW

图片名称

Time of operation

Under production

图片名称

Power Generation Increase

图片名称

1st Robot Cleaning Application of PV Power Plant in Coal Mining Subsidence Area in China


图片名称

Project pain point

  • Inconvenient to do module cleaning in such a large scale mountain project with a scattered layout
  • Serious dust pollution on the panel which makes power is lower than expected
  • Difficult for wireless communication due to complicated topography
图片名称

Highlights

  • Optimize communication deployment locations and adjust physical channels to solve signal diffraction and co-channel interference.
  • Adopt graphic monitoring to collect real-time cleaning status and fault information and identify fault locations to improve O&M performance.
图片名称

Capability

84MW

图片名称

Time of operation

May 2021

图片名称

Power Generation Increase

14.33%