Large-scale Utility Solar Power Station
Agricultural Solar Power Station
Mountain power station
Gobi Desert Solar Power Station
Distributed Solar Power Station
产业布局
The world's Highest Level of Anti-corrosion of PV Cleaning Robot Project in Red Sea, KSA
Project pain point
- Characteristics of high temperature, high humidity and high salinity environment in the coastal area of the Middle East
- The customer has high anti-corrosion grade requirements
- Match the flat single-axis connecting rod tracking bracket
Highlights
- Weatherability design of the product to meet high and low temperature reliable operation
- Customized design of cleaning brush, anti-UV aging and effective solution to saline-alkali dust pollution
Capability
400MW
Time of operation
Under production
Power Generation Increase
1st "2P Tracking Bracket + Intelligent Cleaning Robot" Project in Rabigh, KSA
Project pain point
- Track the support project, and the gale operation strategy is strictly required
- Long one-way cleaning distance
- Communication scheme reliability
Highlights
- Equipped with gale protection strategy and emergency stop design, combined with active wind protection design
- Low power consumption design and power supply system matching design, meet the cleaning distance requirements
- Deploy SCADA locally to meet timeliness and remote control
Capability
399MW
Time of operation
Under production
Power Generation Increase
Largest PV Power Plant Project in Chile
Project pain point
- The temperature difference in the desert area is large and the wind and sand are strong
- Requirements for storm protection levels
Highlights
- Weatherability design of the product to meet high and low temperature reliable operation
- Customized design of cleaning brush
- The project adopts 4P arrangement and the robot is nearly 9.2 meters long
- The cleaning distance of a single robot is 2.2KM
Capability
480MW
Time of operation
Under production
Power Generation Increase
1st Robot Cleaning Application of PV Power Plant in Coal Mining Subsidence Area in China
Project pain point
- Inconvenient to do module cleaning in such a large scale mountain project with a scattered layout
- Serious dust pollution on the panel which makes power is lower than expected
- Difficult for wireless communication due to complicated topography
Highlights
- Optimize communication deployment locations and adjust physical channels to solve signal diffraction and co-channel interference.
- Adopt graphic monitoring to collect real-time cleaning status and fault information and identify fault locations to improve O&M performance.
Capability
84MW
Time of operation
May 2021
Power Generation Increase
14.33%